VMware Project: Difference between revisions

From SaruWiki
Jump to navigation Jump to search
(Project started)
mNo edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 7: Line 7:
** Standarized storage solution
** Standarized storage solution
*
*
== Current Situation ==
At this moment we have Vmware infrastructure 3.0.1 We have 2 ESX hosts HP Dl 385 G1 with 16Gb ram.
Virtual Center 2.0
== Problems ==
Due to the latest expension we have to many vmware hosts to guarantee High availability. We run out of memory to support all hosts on 1 ESX host. When 1 host goes down due to failure.
== Solution ==
There are a few sollutions:
    * turn of some vmware hosts when 1 ESX host goes down
    * Increase the memory
    * scale out with 1 or 2 hosts
Turn off some hosts is a short term sollution
Increase the memory is not possible. The Dl 385 can handle no more then 16Gb of memory.
Scale out is the prefered solution.

Latest revision as of 08:53, 19 July 2008

Our goal is to setup a test environment with VMware esx 3.5.

  • Situation as is
  • Problems with the current setup
  • Proposed solutions
    • VI3
    • Hardware
    • Standarized storage solution

Current Situation

At this moment we have Vmware infrastructure 3.0.1 We have 2 ESX hosts HP Dl 385 G1 with 16Gb ram. Virtual Center 2.0

Problems

Due to the latest expension we have to many vmware hosts to guarantee High availability. We run out of memory to support all hosts on 1 ESX host. When 1 host goes down due to failure.

Solution

There are a few sollutions:

   * turn of some vmware hosts when 1 ESX host goes down
   * Increase the memory
   * scale out with 1 or 2 hosts 

Turn off some hosts is a short term sollution Increase the memory is not possible. The Dl 385 can handle no more then 16Gb of memory. Scale out is the prefered solution.